Saturday, June 11, 2011

Bath Tub Renovation

When I was buying my place, the home inspector thought the cracking in the caulk along the tub and bath floor were from settling. I caulked all the cracks the day I closed, and when I took my first shower I witnessed the water from the walls collecting down at the tub edge, run around to the front of the tub then out onto the bath floor, following the path of all that I had caulked.

Turns out the cracks in the caulk weren't from settling - they were from water damage. The tub was not level - it was tipped forward and out. Not only that, some of the liquid nail wasn't applied well and there's a bulge on the long side of the alcove, making recaulking a difficult task. The water run off was damaging the dry wall right at the edge of the tub too, causing an unsightly gash to appear.


I found a stop gap solution in theses plastic corner shower guards for most of the year, but it gave out finally and I had the choice of trying to strip everything and recaulk - knowing I'd have to do this again and again - or fix it for real.

Fears of needing to touch the subfloor to level it and lack of budget made this difficult to do, but after some research, I found out that when replacing the tub, it can be leveled out, and I can also tile the walls while I'm doing this to get rid of the ugly acrylic wall panels. I wasn't budgeting for this yet, but it had to be done, so I say goodbye to my car fund and off we go.

I found a well rated full service contractor through ServiceMagic and originally they were going to use white tiles with a feature strip of my choosing. I don't have anything against white - I just didn't want a white wall. I already have a white floor and don't have the budget to redo that right now, so white and white wasn't going to cut it. I shopped around and found this combination.


The idea was the blue cloud swirl tile would be the base tile, and there would be a strip of 3 square tall of the mosaic across all 3 walls of the alcove around eye level. I've always wanted a seashore feel so I thought this combination was perfect. 
We place the order, everything seems great, then a few hours later the tile place calls back and says sorry - the blue base tile is discontinued and their supplier doesn't have any left in stock. AAAHHHH!!!! I even did a search online for the distributor - they're in Malaysia. I email them and they replied that style had been discontinued for years, so they don't know of any US suppliers who might still have some left over stock. Drat!

So I run around to find more tile samples, and because the contractor was supplying two corner marble shelves that have grayish veins, I thought this combination (from Home Depot of all places) would work best. It would just be the plain base tile without the decorative trims. Home Depot guarantees 7 business day delivery so we place that order.


The day before work was supposed to start Home Depot doesn't have the tiles. The order was placed 2 weeks before and they said it'll take another 5 or 6 business days!! I went back to a different tile company with yet another tile option who not only had stock, but could deliver the tiles in 2 days, so the final choice was this from Roma Tiles, which is lighter than the original blue, but still had a bluish look to it.


So the demolition was pushed back a day, since the tile wasn't around to install anyway. It didn't take long for the crappy dry wall to come down.


They put in cement boards and new tub while we waited for the tiles.


The next day, tile work was on going while I was at work.


By the end of the day everything was done except for new shower head, curved shower rod, and some odds and ends. We needed to wait to install the new shower rod since it required drilling through the tile, and it's best to do that after the tile has settled in and completed dried. So I kept the tension rod I had before in the mean time.


Today, they came back to caulk any cracks that appeared from settling, and installed the rest of the hardware, including move the glass shelf up a little and installing the originally oddly placed towel bar beneath the glass shelf.


So, after 2.5 cumulative days of contractor labor, 3 base tile options, 6 trips to different hardware stores, 10 trips to different tile stores, over two dozen calls with the contractor and several thousand dollars later, I finally have my new tub and tiled alcove with shiny marble corner shelves. I'm in awe of how caulk can get on absolutely everything in the bathroom and I've mastered scrapping excess dried caulk off of tiles and tub surfaces with a razor.

I can't imagine doing this on my own as a DIY project, and having it last multiple weeks. I don't have that kind of stamina. So I guess I will always be paying the premium for a place that requires no work, because I don't want to do this again.

Sunday, October 24, 2010

Washer Agitator Filter Took Flight

Today was laundry day, and I did 3 loads because I put off one load from the last laundry day, and a bunch of towels needed to be done as well.

Apparently this was too many loads for the poor washer to take. The first load went ok. The second load was sounding kind of odd, where during the spin cycle it was shaking a whole lot (for a load that's not as heavy as the first). I stopped it to check that it wasn't off balance, and everything looked good.

When the third load started it seemed fine, but I had gone down to the basement when the spin cycle was going and didn't hear the really awful clanging until I came back upstairs. It stopped shortly when the cycle ended and when I opened the lid, I found the agitator filter had detached and scrapped along the edge so much it left plastic pieces all along the well opening.

I took the part to Sears and asked how much it would cost to replace it. The part itself isn't too bad, but not knowing whether the original clanging was indicative of a larger problem, and why there's this oily residue all over the place, tells me I might need a technician to come out and make sure there's nothing else wrong. Given that will cost a pretty penny, after the part is added, it's already half the cost of a new front load washer.

The unfortunate thing is, I currently have a connected stacked washer/dryer, so I can't replace the washer without replacing the dryer. Sigh.... I guess it's time to buy a new set of washer and dryer. This time, I'm going for separate washer and dryer so they can be independently serviced and replaced.

Tuesday, May 11, 2010

Home Ownership

Today I became a home owner. This is my new kitchen. It's shiny. :-)

It's been something I've been thinking about for quite some time. It's amazing how much you learn doing something like this, that you would otherwise never have any clue about.

I do feel rather "aged" all of a sudden with this step, much more so than crossing into the land of the thirty-somethings. Now I can commiserate with other people who has a mortgage and worry about home improvements and renovations. Hmm... not quite sure that was necessarily a step in the right direction for feeling 30 as the new 20. 

Either way, this is a milestone. One that will carry with me for 30 years according to my contracts.

I couldn't have done it without "my team" though. Here I am in front of the Cambridge Registry of Deeds with my awesome attorney and agent. Banker's in AZ so he didn't make it into the photo sadly. But he was there in spirit.

The process took a few hours and I had keys in hand after. I went home, grabbed some cooking and cleaning supplies, and headed over to the new place.

My first meal in my new home - pork and leek dumplings in the shiny new kitchen.